Virginia building permit authorities

2025 Census Building Permits Survey directory.

159 permit-issuing authorities

The Census Building Permits Survey lists 159 authorities in Virginia. They reported 33,094 residential units permitted in 2025; 148 reported activity.

This is a directory of issuing authorities, not a claim that every authority provides an open permit database. Data availability and suitability for a project signal are measured separately.

Use the directory to identify the authority that owns a local permit record, then check its own public site for the current record and access conditions. Inclusion in the federal survey is not a claim of data completeness or a construction forecast.

Largest authorities by 2025 residential units

AuthorityUnits permitted
Richmond2,681
Fairfax County Unincorporated Area2,463
Henrico County2,323
Chesterfield County2,194
Loudoun County Unincorporated Area1,407
Prince William County Unincorporated Area1,340
Arlington County1,309
Charlottesville889
Chesapeake846
Albemarle County729
Frederick County707
Rockingham County685

Source: U.S. Census Bureau Building Permits Survey, 2025.

What this directory can and cannot answer

It can show the scale of permit reporting by authority. It cannot tell whether a particular address has an active project, whether an authority publishes a usable permit feed, or whether a company will receive work. Those are separate questions that require the authority’s source records and market-specific measurement.

Key takeaways

This directory records 159 authorities that issued permits in Virginia and 33,094 residential units reported for 2025. Our analysis of the Census survey shows reporting scale, not whether an authority has an open permit database or whether a particular project is active. Those questions need the authority’s own current record.

  • Use the authority name to locate the primary record.
  • Check local data availability separately.
  • Verify a project before outreach or a bid decision.

Common question

Does inclusion mean Projects Ahead has a usable project signal there?

No. Inclusion means the Census survey identifies an authority that issues permits. A usable project signal requires separate testing of source access, fields and the ability to reconstruct a project timeline.